DULY INSTRUCTED BY THE LIQUIDATORS
INVITATION TO SUBMIT OFFERS
Property:
Remainder of Portion 6 of the Farm Allemans Drift 950 FT off R07, Howick
(measuring 11.4082 Hectares)
Administration Offices:
The Administration Office is a three-storey office building of concrete column and slab with face brick infill fitted with aluminium framed glazing under a pitched IBR roofing structure comprising a reception area, private offices, open plan office areas, boardroom, laboratory, storerooms, staff kitchen and cloakrooms.
Flooring: Carpeting and ceramic floor tiles
Walling: Plastered and painted brick, ceramic wall tiles
Ceilings: Suspended ceiling boards
Internal Fittings & Fixtures include split air-conditioning units with standard sanitaryware in the cloakrooms.
Warehouse and Cold Storage:
Situated at the back of the Administration Building and forming part of the same building structure is a large double volume steel framed with block walls under and IBR roof sheeting warehouse building comprising a temperature-controlled cold storage warehouse, seventeen (17) sealed truck bays and two (2) 1100 KVA Diesel Generators.
Flooring: Cement floated, epoxy screed flooring with sump drains
Walling: Block walling with insulating polystyrene panels
Ceilings: IBR roof sheeting with insulating polystyrene panels
Logistics Offices:
The Logistic Office is a free-standing single-storey building of plastered and painted and face brick walling fitted with aluminium framed glazing under pitched Corrugated Iron roof sheeting comprising a reception area, private offices, open plan office areas, staff kitchen and cloakrooms.
Flooring: Carpeting and ceramic floor tiles
Walling: Plastered and painted brick, ceramic wall tiles
Ceilings: Suspended ceiling boards
Internal Fittings & Fixtures include split air-conditioning units with standard sanitaryware in the cloakrooms.
Other Improvements:
Other improvements include a Biofuel Facility / Boiler Warehouse, Powder Milk Plant, Truck Wash Bay, Staff Canteen, Staff Ablution and Workshops.
Electrical Installation: The electrical supply is via the uMngeni Local Municipality.
Surface Areas: The driveways and parking areas are brick paved covering approximately 19 000 m²
No images available.
Preview Times:
Viewing by Appointment
Address:
Allemans Drift Farm
Main Road, Howick, KwaZulu-Natal